The Long Game for All: Counting What Frontlines Know
The Long Game for All: Counting What Frontlines Know · Sep 11, 2026 · 21:50
Listen in the Podli app 🎧
Follow your favourite podcasts, listen offline and in the car with CarPlay and Android Auto, and always pick up where you left off. Free to try.
Part One ended on a man at a machine, solving the wrong problem well.
He is optimizing. He is a superb optimizer. We just never told him what for.
That is the second failure, and it is the one that does not go away when you fix the board. You can cut twenty metrics to five, name the binding constraint, and publish it in every aisle — and the operator will still be reasoning in the dark, because the number that gives all five their meaning is the one number we have decided he cannot see.
Three Reasons We Don’t Show the Numbers
We do not give the floor the base financials. Ask any plant leadership team why and you will get one of three answers.
They won’t understand it. This one does not survive ten seconds of contact with the people involved. The operator running a household on variable overtime, a mortgage, a car note, and a kid starting community college is performing continuous multi-constraint budgeting under uncertainty, without software, with real consequences for error. He understands margin. He has just never been shown ours.
I want to put a name against that.
Lansing Grand River, during the CTS launch. We had a chronic defect — the instrument panel scuffing the door opening as it went in. The easy move, the one the system rewards, is to blame the operator and log it. Ramon Hernandez, my team leader on instrument-panel install, did the opposite. He took the blame onto himself. He gathered data shift after shift. And he traced the fault back to a tool mechanism on his own team.
Now look at what Ramon was actually doing. A defect caught in-station costs a fraction of one caught at repair, which costs a fraction of one that leaves the plant, which costs a fraction of a warranty claim with a customer’s name on it. That is the cost-of-quality curve, and it drives an enormous share of plant profitability. Ramon worked his way down it, correctly, on nights, while absorbing blame that was not his.
He never used a word of that vocabulary. Money was never in Ramon’s language, and I want to be clear about why: we made sure it wasn’t. We stripped it out deliberately. Cost was management’s business and quality was the floor’s, and we ran the line that way on purpose.
With one exception. The floor did see the cost of scrap parts.
Sit with which number we chose. Not what the plant earned. Not the margin on a car. Not what a defect caught in-station was worth to us. The single piece of financial information we made sure the floor could see was the price of what they had ruined.
That is not withholding out of doubt about their intelligence. That is a curated disclosure, and what it was curated to produce was guilt.
Ramon pulled real money off that plant’s P&L. Nobody ever showed him how much.
They won’t hold it confidentially. Also thin. We hand quality escape data, customer complaint detail, and process specifications to the same people every day. The proprietary material is already in their hands. It is the summary statement we withhold — the one document that would let them see what all their effort adds up to.
If they see the numbers they’ll want more money. This one is honest. And it is worth sitting with what it admits.
It says: our wage will not survive scrutiny. It says we are relying on ignorance to hold the line on labour cost. It says the thing we are protecting is not confidentiality — it is an information asymmetry we have decided is load-bearing.
That is a defensible commercial position. It is not a defensible position for anyone who also claims to be developing people. You cannot form judgment in someone while withholding the only information judgment requires. Formation and information asymmetry are not compatible projects. You have to pick one.
Three Companies That Opened the Books
Springfield Remanufacturing: they taught it from zero, under maximum duress
In 1983, Jack Stack and twelve managers were trying to save 119 jobs at International Harvester’s engine remanufacturing plant in Springfield, Missouri. They put together a hundred thousand dollars in cash and borrowed 8.9 million — at eighteen percent interest. A debt-to-equity ratio of eighty-nine to one, in a dying division of a dying company.
This is the critical fact about SRC and it is usually skipped. Opening the books was not generosity from a comfortable company. It was the only asset they had left. They could not pay competitively, could not guarantee anything, and could not out-equip anyone. So they taught the workforce to read the financial statements and let them play the actual game.
Today SRC Holdings runs 1,900 employees across fourteen business units at roughly $600 million in annual sales. Share value went from ten cents in 1983 to over $764. Hourly employees’ ESOP holdings grew from around $35,000 to about $400,000.
Stack’s description of the business is the sentence I would put on a plant wall: their real business is education, and what they teach people is business. A remanufacturer of diesel engines, in a loud dirty shop where people leave covered in grease, describing itself as an education company. That is the formation thesis, stated by an American plant guy in 1983, without any of the vocabulary.
And on the question of whether the floor can understand a P&L: at SRC, people without a high school diploma can tell you how the toilet paper they use lands on the statement. Not because they were taught accounting. Because they were taught that consumption on the floor arrives somewhere, and where.
ELGi: what formation costs, and what it returns
ELGi Equipments, Coimbatore. In 2019 it became the first globally established industrial air compressor manufacturer outside Japan to win the Deming Prize in over sixty years — an award given to
Episodes: The Long Game for All: Counting What Frontlines Know