Podlipodcast player Webplayer

The End of the Road in Michigan

The End of the Road in Michigan

Building the Detroit-Windsor Tunnel: Nine Steel Tubes Beneath the River 1928-1930

The End of the Road in Michigan · Oct 16, 2026 · 7:49

0:007:49

Listen in the Podli app 🎧

Follow your favourite podcasts, listen offline and in the car with CarPlay and Android Auto, and always pick up where you left off. Free to try.

From 1928 to 1930, crews built a highway tunnel beneath the Detroit River using steel, concrete, dredging, and compressed-air excavation. One 500-ton tube nearly toppled when its timber supports failed.

The workers regrouped, lowered nine steel sections into a riverbed trench, joined them underwater and connected them to tunnel approaches on both shores. Hear how welders, tugboat crews, divers, and tunnel workers helped build the Detroit-Windsor Tunnel, which opened to traffic on Nov. 3, 1930.

The End of the Road in Michigan is a production of Thumbwind Publications

This episode includes AI-generated content.

Episodes: The End of the Road in Michigan

PodliGet the free Podli app
↓ App